The last Envisat maintenance manoeuvre has performed as follows:

		(Mid-)Time		Mode	Target Size	Nominal Size	Calibrated Size
First burn	2010/07/07-02:03:02	SFCM	-2.4 mm/s	-2.4 mm/s	-2.3 mm/s

The overall calibration result has been: -4.3%

The total fuel consumption has been:  0.0092 kg