The last Envisat orbit maintenance manoeuvre has performed as follows:

		(Mid-)Time		Mode	Target Size	Nominal Size	Calibrated Size 	
First burn	2010/07/06-04:41:43	OCM	0.870 m/s	0.870 m/s	0.8734 m/s

The radial component was  : -27,0 mm/s
The along-track comp. was :   7.8 mm/s

The overall calibration result has been:  +0.4 % 

The total fuel consumption has been: 3.8146 kg