The last Envisat orbit maintenance manoeuvre has performed as follows: (Mid-)Time Mode Target Size Nominal Size Calibrated Size First burn 2010/04/27-04:41:44 OCM 0.946 m/s 0.946 m/s 0.941 m/s The radial component was : -21,2 mm/s The along-track comp. was : 7.5 mm/s The overall calibration result has been: -0.6 % The total fuel consumption has been: 4.0799 kg