The last Envisat maintenance manoeuvre has performed as follows:

		(Mid-)Time		Mode	Target Size	Nominal Size	Calibrated Size
First burn	2010/02/22-21:13:22	SFCM	1.9 mm/s	1.9 mm/s	1.8 mm/s
Second burn     2010/02/22-22:03:40	SFCM	1.9 mm/s	1.9 mm/s	1.9 mm/s

The overall calibration result has been:   -4.2%

The total fuel consumption has been:  0.0144 kg