The last Envisat orbit maintenance manoeuvre has performed as follows: (Mid-)Time Mode Target Size Nominal Size Calibrated Size First burn 2010/02/16-04:41:45 OCM 1.550 m/s 1.550 m/s 1.543 m/s The radial component was : -20,0 mm/s The along-track comp. was : 7.3 mm/s The overall calibration result has been: -0.4 % The total fuel consumption has been: 6.2723 kg