The last Envisat maintenance manoeuvre has performed as follows:

		(Mid-)Time		Mode	Target Size	Nominal Size	Calibrated Size
First burn	2010/01/22-01:52:02	SFCM	-5.0 mm/s	-4.9 mm/s	-5.1 mm/s

The overall calibration result has been:   +4.0%

The total fuel consumption has been:  0.0302 kg