The last Envisat maintenance manoeuvre has performed as follows:

		(Mid-)Time		Mode	Target Size	Nominal Size	Calibrated Size
First burn	2010/01/21-02:03:09	SFCM	 40.0 mm/s	 40.0 mm/s	 43.3 mm/s
Second burn     2010/01/21-03:43:45	SFCM	-39.1 mm/s	-39.1 mm/s	 37.6 mm/s


The overall calibration result has been: +8.2% for the first burn and -3.8% for the second burn

The total fuel consumption has been:  0.321 kg