The performance of the Envisat orbit maintenance manoeuvre was as follows: Mid-)Time Mode Target Size Nominal Size Calibrated Size First burn 2009/12/08-04:41:45 OCM 1.400 m/s 1.400 m/s 1.438 m/s The radial component was : -53,5 mm/s The along-track comp. was : 1.3 mm/s The overall calibration result has been: +2.8 % The total fuel consumption has been: 5,7975 kg