The performance of the Envisat orbit maintenance manoeuvre was as follows:

Time                    Target Size     Mode    Nominal Size    Calibrated Size
2007/12/04-04:41:51	1.5180 m/sec	OCM	1.5180 m/sec	1.5590 m/sec                          
                               
 
The inclination manoeuvre had a residual effect in the:

The radial direction: 		-45.4 mm/s
The along-track direction:	  1.0 mm/s

The overall calibration result has been:  +2.7%

The total fuel consumption for this burn was: 6.2173 kg