The performance of the Envisat orbit maintenance manoeuvre was as follows:
Time Target Size Mode Nominal Size Calibrated Size
2007/07/17-04:42:01 0.2500 m/sec OCM 0.2500 m/sec 0.2413 m/sec
The inclination manoeuvre had a residual effect in the:
The radial direction: -31.2 mm/s
The along-track direction: -5.4 mm/s
The overall calibration result has been: -2.7%
The total fuel consumption for this burn was: 1.5230 kg