The performance of the Envisat orbit maintenance manoeuvre was as follows:
Time Target Size Mode Nominal Size Calibrated Size
2007/01/23-04:41:50 2.2120 m/sec OCM 2.2120 m/sec 2.2276 m/sec
The inclination manoeuvre had a residual effect in the:
The radial direction: -52.4 mm/s
The along-track direction: 5.3 mm/s
The overall calibration result has been: +0.7%
The total fuel consumption for this burn was: 8.6197 kg