The performance of the Envisat orbit maintenance manoeuvre was as follows:

Time                    Target Size     Mode    Nominal Size    Calibrated Size
2006/09/13-05:30:50	2.1000 m/sec	OCM	2.1000 m/sec	2.0920 m/sec                          
                               
 
The inclination manoeuvre had a residual effect in the:

The radial direction: 		-10.4 mm/s
The along-track direction:	  8.2 mm/s

The overall calibration result has been:  -0.4%

The total fuel consumption for this burn was: 8.2262 kg