The performance of the Envisat orbit maintenance manoeuvre was as follows:
Time Target Size Mode Nominal Size Calibrated Size
2006/03/28-05:42:12 2.3000 m/sec OCM 2.3000 m/sec 2.2797 m/sec
The inclination manoeuvre had a residual effect in the:
The radial direction: -40.9 mm/s
The along-track direction: 8.0 mm/s
The overall calibration result has been: -0.9%
The total fuel consumption for this burn was: 8.8917 kg