The performance of the Envisat orbit maintenance manoeuvre was as follows:
Time Target Size Mode Nominal Size Calibrated Size
2005/09/07-06:19:21 2.1000 m/sec OCM 2.0999 m/sec 2.1005 m/sec
The inclination manoeuvre had a residual effect in the:
Radial direction: -0.0151 m/s
Along-track direction: 0.0113 m/s
The overall calibration result has been: +0.05 %
The total fuel consumption for this burn was: 8.2015 kg