The performance of the Envisat orbit maintenance manoeuvre was as follows: Time Target Size Mode Nominal Size Calibrated Size 2005/01/07-05:24:45 1.9000 m/sec OCM 1.9000 m/sec 1.9132 m/sec The inclination manoeuvre had a residual effect in the: Radial direction: -0.0499 m/s Along-track direction: 0.0029 m/s The overall calibration result was: +0.7 % The total fuel consumption for this burn was: 7.4597 kg