The performance of the Envisat orbit maintenance manoeuvre was as follows:

Time                    Target Size     Mode    Nominal Size    Calibrated Size
2004/09/21-05:14:05	2.0000 m/sec	OCM	2.0000 m/sec	1.9967 m/sec 	

The inclination manoeuvre had a residual effect in the:

Radial direction:	-0.0401 m/s
Along-track direction:	0.0049 m/s

The overall calibration result was: -1.5 %

The total fuel consumption for this burn was: 7.8350 kg