The performance of the Envisat orbit maintenance manoeuvre was as follows: Time Target Size Mode Nominal Size Calibrated Size 2004/04/14-05:42:29 1.7500 m/sec OCM 1.7500 m/sec 1.7320 m/sec The inclination manoeuvre had a residual effect in the: Radial direction: -0.0160 m/s Along-track direction: 0.0085 m/s The overall calibration result was: -1.0 % The total fuel consumption for this burn was: 6.8816 kg