The performance of the Envisat orbit maintenance manoeuvre was as follows: Time Target Size Mode Nominal Size Calibrated Size 2004/02/04-05:51:50 1.7545 m/sec OCM 1.7545 m/sec 1.7448 m/sec The inclination manoeuvre had a residual effect in the: Radial direction: -0.0339 m/s Along-track direction: 0.0025 m/s The overall calibration result was: -0.5 % The total fuel consumption for this burn was: 6.8809 kg