The performance of the Envisat orbit maintenance manoeuvre was as follows:

Time                    Target Size     Mode    Nominal Size    Calibrated Size
2003/10/28-06:02:29	2.0000 m/sec	OCM	1.9999 m/sec	2.0042 m/sec 	

The inclination manoeuvre had a residual effect in the:

Radial direction:       -0.0469 m/s
Along-track direction:   0.0052 m/s

The overall calibration result was: +0.2 %

The total fuel consumption for this burn was: 7.804 kg