The performance of the Envisat orbit maintenance manoeuvre was as follows:

Time                    Target Size     Mode    Nominal Size    Calibrated Size
2003/05/20-05:17:10	1.8500 m/sec	OCM	1.8501 m/sec	1.8754 m/sec 		

The inclination manoeuvre had a residual effect in the:

Radial direction:	-0.0183 m/s
Along-track direction:	0.0113 m/s

The overall calibration result was: 1.18 %

The total fuel consumption for these two burns was: 7.3030 kg